Contact

Use case OGENLimit interventions on-site.

Avoid emergency interventions due to freezing.

The solution Save Innovations

CONFIGURATION

Pipeline: DN100

Average flow rate: 10 m³/h

Pressure: 6 bars

Acceptable pressure drop: 1 bar

NEED

240 Wh/day, or 10 Wh continuously

1 heating cable

PERFORMANCE

312 Wh/day, or 13 Wh continuously

0.3 bar pressure drop

Issues

Ensure the quality of the distributed water and limit interventions.

Objectives

Prevent the dosing pump capillaries from freezing in winter at a pressure relief site in the mountains.

Requirements

The operator is looking for an autonomous power supply solution for a heating cable.

Constraints

The site is a mountain pressure relief station located in a remote area, so connecting to the EDF network would be too expensive, and the operation of solar panels is limited.

Stakeholders

Water union of an urban area.

Autres cas d'usage d'intégration de nos solutions technologiques